News

The installation of Gustavo's second mural begins.

15/04/2015
Last week the tiles began to be laid at the dock of Cala Rajada and are expected to be finished by the end of this month.
This second mural has the same measures as the previous one, 4x16 meters and will be located next to the other one.

Empieza la instalación del segundo mural de Gustavo en Cala Rajada
Última Hora
14.05.2015

Entradas recientes